3CON PROJECT

 

Control-based Hierarchical Consolidation of Large Consumers

for Integration in Smart Grids

 

The 3CON research project is funded by Croatian Science Foundation. Overall project duration is 36 months, in period from December 1, 2014 to November 30, 2017.


3CON Industrial advisory board meeting

Second meeting of the 3CON industrial advisory board took place on the 30th September, 2015 at the University of Zagreb, Faculty of Electrical Engineering and Computing.

After a short presentation of the current project progress and dissemination overview, the initial validation environments and scenarios for railway transport systems and buildings case studies were presented. Case studies presentation was followed by a discussion with the advisory board on the proposed scenarios where future work directions were defined.

Author: Hrvoje Novak
News list