Summary_Week_Report42 [38.95 KiB]
Noticed latter that I confused two rows in Milestones table.
I first wrote that M009 is achieved week early, and it should be that M004 is completed at week 42. So I changed that.
Published: Baračić Loredana ( 2010-10-25 at 22:01 )
Updated: Baračić Loredana
( 2010-10-26 at 07:37 )