
Optimal Battery Storage Participation in European Energy and Reserves Markets
Experimental Testing and Evaluation of Lithium- Ion Battery Cells for a Special-Purpose Electric Vacuum Sweeper Vehicle
Battery storage instalation in distribution grid of Elektra Zagreb
Mathematical model of flexible multi-energy industrial prosumer under uncertainty
Multi-energy Microgrid Ability to Provide Flexibility Services to the System Operator and Security of Supply to End-users
Dynamic Electricity Pricing Tariffs:Trade-offs for Suppliers and Consumers
Electric Vehicles as Frequency Containment Reserve Providers
Electric vehicle based smart e-mobility system – Definition and comparison to the existing concept
Analysis of the needs and regulation possiblities of energy storage integration in TS Bilice, TS Nijemci, TS Glina i TS Lošinj
Techno-economic assessment of Battery Energy Storage on Island of Vis
Technical study for connection of solar power plant Bogomolje (10000 kW) to the distribution grid
Technical study for connection of solar power plant SE Šestanovac to the distribution grid
Market-oriented power system operation adjusted for new distributed technology – case study France
Analysis of Demand Response Potentials in Croatian Power System
Technical study for connection of solar power plant Konjščina (17000 kW) to the distribution grid
Technical study for connection of solar power plant Ivanec (15500 kW) to the distribution grid)
Technical study for connection of wind power plant Dazlina (19900 kW) to the distribution grid
Effect of Stochastic Variables on Balancing Mechanism
Usage possiblities study of generation response of distributed power plants and flexible demand on TS Županja area
Općina Hum na Sutli distribution network analysis
Pilot project - energy storage parameter identification in Čazma middle voltage network in Elektra Križ
Technical study for connection of wind power plant Jasenice 2 (10000 kW) to the distribution grid
Technical study for connection of solar power plant Hrvace(9900 kW) to the distribution grid
Defining and Evaluating Use Cases for Battery Energy Storage Investments: Case Study in Croatia
Energy and reserve co-optimisation – reserve availability, lost opportunity and uplift compensation cost
Development of medium-voltage distribution network in Elektroslavonija Osijek for the next 20 years
Strategic analysis of potential battery system project development as a support of power generation in Croatia
A Review of Energy Storage Systems Applications
Impact of an Aggregator of Distributed Energy Resources on Traditional Power System Participants
Decentralized Master-Slave Communication and Control Architecture of a Battery Swapping Station
Evaluating Flexibility of Business Models for Distributed Energy Resource Aggregators
Profit Margin of Electric Vehicle Battery Aggregator
Technical study for connection of solar power plant Gornji Humac (2000 kW) to the distribution grid
Impact of EU New Energy Policy on HEP Group with Adjustments Guidelines
Models for the Participation of Aggregators of Distributed Flexibility Services Providers in the Electricity Market in Croatia
Technical study for connection of solar power plant Dugopolje (10000 kW) to the distribution grid
Electricity Market Design in Croatia within the European Electricity Market—Recommendations for Further Development
Technical study for connection biomass power plant BM Vocin 1 (1000 kW)
Technical study for connection coogeneration power plant Keter Bioel 2 (999 kW)
Technical study for connection of consumer (5077, 77 kW) with local production (1600 kW) Tvin d.o.o. to the distribution grid
A Comprehensive Approach for Maximizing Flexibility Benefits of Electric Vehicles
Generation Scheduling in Power Systems with High Penetration of Renewable Energy
Technical study for connection of network customer Spin Valis d.d. (2151 kW consumption ; 1418 kW generation) to the distribution grid
Croatian electricity market – position of distributed energy resources
Capacity remuneration mechanisms in energy winter package
Electric vehicle charging infrastructure integration in Karlovac distribution network
Flexibility analysis of future power system with integrated electric vehicles
Technical study for connection of biomass power plant Kogeneracijsko energetsko postrojenje na drvnu biomasu Donja Stubica (4960 kW) to the distribution grid
Technical study for connection of biogas power plant Popovac (2000 kW) to the distribution grid
Fast charging stations — Power and ancillary services provision
Electricity markets overview — Market participation possibilities for renewable and distributed energy resources
Operating reserve allocation methods relative to energy unit commitment
Technical study for connection of wood pellets production plant Peletana Klanjec (1500 kW) to the distribution grid
Technical study for connection of biomass power plant Kogeneracijsko energetsko postrojenje na drvnu biomasu Klanjec (1900 kW) to the distribution grid
Electric Vehicles Impact on Transmission System Developement
Transportation and Power System Interdependency for Urban Fast Charging and Battery Swapping Stations in Croatia
Design and Need for Electricity Market at Distribution Level
Technical study for connection of waste-to- energy power plant Kogeneracijsko postrojenje na gorivi otpad CIOS (3500 kW) to the distribution grid
Technical study for connection of consumer with production ( 2, 4 MW consumption and 2 MW u smjeru production) to the distribution grid
Technical study for connection of consumer Tvornice kabela Primca d.o.o. (2500 kW) to the distribution grid
Technical study for connection of biogas power plant Sladojevci (1000 kW + 1000 kW) to the distribution grid
Technical study for connection of CHP power plant Sisak I (5000 kW) + Sisak II (5000 kW) to the distribution grid
Technical study for connection of biogas power plant AAT Šarampov (2000 kW) to the distribution grid
Technical study for connection of solar power plant Koljane (6800 kW) to the distribution grid
Technical study for connection of biomass power plant QUERCUS-ENERGIJA (1100 kW) to the distribution grid
Technical study for connection of biogas power plant KAPELICA (2000 kW) to the distribution grid
Technical study for connection of CHP power plant OZALJ (1800 kW) to the distribution grid
Technical study for connection of hybrid gas power plant ING GRAD Velika Gorica (5000 kW) to the distribution grid
Technical study for connection of geothermal power plant Rečica (5000 kW) to the distribution grid
Technical study for connection of CHP power plant Eco- biogas (1200 kW) to the distribution grid
Technical study for connection of CHP plant Donji Lapac I (5000 kW) + Donji Lapac II (5000kW) to the distribution grid
Technical study for connection of biogas power plant Bioplinsko postrojenje Đurđevac (2000 kW) to the distribution grid
Technical study for connection of biogas power plant Crnac 1 (1150 kW) to the distribution grid
Technical study for connection of CHP power plant EDB MITROVAC (2000 kW) to the distribution grid
Technical study for connection of biomass power plant BE- TO Velika Gorica (4999 kW) to the distribution grid
Technical study for connection of hybrid gas power plant AAT GEOTHERMAE (10000 kW) to the distribution grid
Technical study: grid impact assesment for micro hydro power plant MHE Dabrova Dolina 1
Technical study - Protection setting for micro HPP Dabrova dolina
Improved grid operation through power smoothing control strategies utilizing dedicated energy storage at an electric vehicle charging station
Operational reliability impact on development and maintenance of the distribution system
Low Carbon Technologies as Providers of Operational Flexibility in Future Power Systems
Development of the Zabok distribution network in the time period 2014-2034
Development of the Virovitica distribution network in the time period 2014-2034
Technical study for connection of consumer Fremitus (4000 kW) to the electrical distribution grid
Technical study for connection of biomass power plant Prvo plinarsko drustvo (5000 kW) to the electrical distribution grid
Technical study for connection of biogas power plant Moslavka (2000 kW) to the electrical distribution grid
Technical study for connection of biomass power plant Stara Sava Gradiška (2000kW) to the electrical distribution grid
Technical study for connection of wind power plant Vrbnik (10000 kW) to the electrical distribution grid
Technical study for connection of biogas power plant KRAKA (2000 kW) to the electrical distribution grid
Technical study for connection of cogeneration power plant Green energy projects (5000 kW) to the electrical distribution grid
Technical study for connection of cogeneration power plant DELNI Lučice (2000 kW) to the electrical distribution grid
Technical study for connection of biogas power plant BPE Ekoplin (2000 kW) to the electrical distribution grid
Technical study for connection of biomass power plant Clean Energy (1980 kW) to the electrical distribution grid
Defining the Role of Traditional and Low Carbon Technologies in Providing Flexibility for Future Power Systems Operation
Distribution Network Reliability and Asset Management
Value of Flexible Electric Vehicles in Providing Spinning Reserve Services
Technical study for connection of CHP power plant Široke Livade (2000 kW) to the distribution grid
Technical study for connection of CHP power plant Ina Etan (2000 kW) to the distribution grid
Technical study for connection of geothermal power plant GTE Marija (10000 kW) to the distribution grid
Technical study for connection of mHE Zeleni Vir (2560 kW) to the distribution grid
Technical study for connection of biomass power plant mTE Logorište (3000 kW) to the distribution grid
Technical study for connection of biomass power plant BE- TO Drvni Centar (4600 kW) to the distribution grid
Technical study for connection of biomass power plant Bingo Veliki Grđevac (2000 kW) to the distribution grid
Technical study for connection of biomass power plant Višnjica (2000 kW) to the distribution grid
Technical study for connection of biomass power plant Runolist (2000 kW) to the distribution grid
Technical study for connection of biogas power plant Energo-centar (2000 kW) to the distribution grid
Technical study for connection of biogas power plant Kula (2000 kW) to the distribution grid
Technical study for connection of biogas power plant BPP Bojana (2000 kW) to the distribution grid
Technical study for connection of biogas power plant Agro Watt Marinkovac (1200 kW) to the distribution grid
Technical study for connection of biogas power plant BPP AGRO-WATT (1200 kW) to the distribution grid
Technical study for connection of biogas power plant BPE Ekoplin (2000 kW) to the distribution grid
Technical study for connection of biomass power plant Energija Turbina to the distribution grid
Technical study for connection of biomass power plant SPAČVA to the transmission grid
Technical study for connection of biomass power plant BE- TO Karlovac to the transmission grid
Role and Impact of Coordinated EV Charging on Flexibility in Low Carbon Power Systems
Teaching duties
University graduate
- Laboratory of Electrical Power Engineering 1 (Lecturers)
- Electric Power Market (Exercises)
- Power System Maintenance (Exercises)

Teaching duties
University undergraduate
- Computer Aided Design of Electronic Systems (Lecturers)
- Electronic Equipment Design (Lecturers)
University graduate
- Programming Industrial Embedded Systems (Lecturers)
Competences
-
Computers and information processing
Real-time systems